Why housing built by inside and outside
Why housing built by inside and outside
According to fengshui, people in the building housing, should look after good foundation, completed a bedroom, and then configure other each room, the door and other work are subject to final finish for outside.
If from outside to inside when it comes to housing, engineering to complete appearance, then the house work, that is not very ideal.Because it makes building produced in the process of sewage gas and the noxious gas trapped in the room, make the residence breath not free, thus influence daily life of the Lord.
In practice, when the housing should be from the inside out, it's like to wear clothes, should wear a bra to wear coat.In the implementation of residential project, if you do outside work, then internal engineering, in material handling, can happen stained completed part of the risk.
Anyway, residential building work program must be in the order from the inside out prior to this, this is necessary, in pay expensive today is a very important thing.Even create a log cabin, also need a lot of the same kind of workers, one thousand fortifications plan didn't do, improper construction program, construction time was longer, pay wages will be more.
The following housing to illustrate construction program:
Based engineering: 1. The project is the foundation of buildings, most of them in the ground operation, so the foundation stability, safety is related to the whole house, so it is important to pay special attention to.In wooden houses, the basis of the concrete in the underground engineering at least 30 cm thick, the earth will have 20 ~ 30 cm thick can, otherwise, may occur due to weak foundation in the futureHouses collapsedThe danger.
2. The shaft engineering: column frame beam work such as residential skeleton combination.
3. Bed project: complete skeleton of shaft engineering by plane.
Engineering: 4. Hut roof part of the works.
5. Artificial engineering: outside the room is decorated assignments.
6. Equipment engineering: electrical wiring and piping water supply and drainage, etc.
7. Furniture project: such as do a built-in wardrobe or cupboard, quilt cabinet or indoor decoration, etc.
8. Structure and outside garden project: door, wall and garden plant trees, etc.
Over the work of building residential program, if can in accordance with this program, step by step to the construction, not only can reduce the duplication of different nature, make the project completed as soon as possible, and also can save a lot of cost in the economic sphere.
As a kind of existence space, the residence is the place of humans to recharge.For housing, housing for people, people curtilage, sense of heaven and earth.So, in the housing, must use dialectical point of view, by inside and outside in order to build.