Orderly construction method: step by step from inside to outside
Orderly construction method: step by step from inside to outside
According to traditional geomantic learn, when building houses, people should lay a foundation first, then finish the bedroom, then configure other room, the door and other work are subject to final finish for outside.
If from outside to inside when it comes to housing, engineering to complete appearance, then the house work, that is not very ideal.Because it makes building produced in the process of sewage gas and the noxious gas trapped in the room, make the residence breath not free, thus influence daily life of the Lord.
In practice, when the housing should be from the inside out, it's like to wear clothes, should wear a bra to wear coat.In the implementation of residential project, if you do outside work, then internal engineering, in material handling, can happen stained completed part of the risk.
Anyway, residential building work program must be in the order from the inside out prior to this, this is necessary, in pay expensive today is a very important thing.Even create a log cabin, also need a lot of the same kind of workers, one thousand fortifications plan didn't do, improper construction program, construction time was longer, pay wages will increase.
In order to build below method to illustrate the program of building residential construction.
Foundation project: the project is the foundation of the building parts, most of them in the underground operation, so the foundation stability, safety is related to the whole house, so it is important to pay special attention to.In wooden houses, the basis of the concrete in the underground engineering at least 30 cm thick, the earth will have 20 ~ 30 cm thick can, otherwise, may occur due to weak foundation in the futureHouses collapsedThe danger.
Shaft engineering: column frame beam work such as residential skeleton combination.
Bed project: complete skeleton of shaft engineering by plane.
Cabin engineering: roof part of the works.
Artificial engineering: outside the room is decorated assignments.
Equipment engineering: electrical wiring and piping water supply and drainage, etc.
Furniture project: such as closet or indoor upholster, etc.
Structure and garden project: outside door, wall and garden plant trees, etc.
If the above is the job of the housing program, can according to the program, step by step to the construction, not only can reduce the duplication of different nature of the project, make the whole project completed as soon as possible, and also can save the cost in the economic sphere.
As a kind of existence space, the residence is the place of humans to recharge.For housing, housing for people, people curtilage, sense of heaven and earth.So, in the housing, must use dialectical point of view, by inside and outside in order to build.
The harmonious household formula
By inside and outside follow the program,
Don't panic step by step.
Person curtilage the same sense of heaven and earth,
Save your strength a new home.
Orderly construction method: by inside and outside related content step by step:
- Household geomantic layout of zhouyi explanation
- Put kaiyun plant transport method
- In 2012, feng shui layout household
- Household geomantic: accidentally move dogged by bad luck will know
- Household: feng shui feng shui of rent can not be ignored
- Household is decorated in the door of feng shui
- These household geomantic overlooked
- Household geomantic ubiquitous women wear shoes also speak feng shui